Hubby and I have a lot of work ahead of us. Mostly we will need to finish the renovations but there are other tasks ahead which when I stop to think about it I just about freak out. Here's a list of "to do" before school reopens in September:
1. Fix bathroom taps at rental.
2. Complete shearing on animals.
3. Breed Mishka.
4. Put siding up in girls bedrooms.
5. Install doors in girls bedrooms.
6. Bight the bullet and buy wardrobes for girls rooms.
7. Finish installing pine paneling in studio and office.
8. Install strapping for ceiling tiles in office and studio.
9. Install ceiling tiles in office.
10. Finish wood burning enough ceiling tiles for studio.
11. Install ceiling tiles in studio.
12. Plumb the new laundry closet upstairs.
13. Move washer and dryer upstairs.
14. Remove shower stall from downstairs.
15. Install plumbing for upstairs bathroom.
16. Remove current plumbing for downstairs bathroom.
17. Install new plumbing for downstairs bathroom.
18. Move downstairs shower to upstairs. (If we can!)
19. Bring in new jacuzzi tub and install in downstairs bathroom.
20. Install electricity for Jacuzzi tub.
21. Remove downstairs toilet.
22. Install new downstairs toilet. (this is a medical toilet for Dad)
23. Cut new doorway to downstairs bathroom.
24. Install step in downstairs bathroom.
25. Install door to downstairs bathroom.
26. Install new wall cutting off old doorway to bathroom.
27. Install shelves in new kitchen pantry. (I can do this while the men carry on with the upstairs bathroom.)
28. Install toilet and sink in upstairs bathroom.
29. Make sure plumbing and electrical are to code.
30. Install all new electrical switches and outlets as well as light fixtures.
31. Install fencing for new paddock.
32. Put new roofing on electrical shed.
33. Put pine on ceiling upstairs.
34. Install pocket doors upstairs.
35. Panel hallway and stairway upstairs.
36. Panel closet and new bathroom upstairs.
37. Panel master bedroom.
38. Install flooring.
39. Move furniture back to house from shed.
40. Clean shed.
41. Pick up cottage sized mill and picker.
42. Buy new bed and mattress.
43. Build new wardrobes (2) for master bedroom.
44. Install new counters in kitchen.
45. Put window in the door to the office.
I'm tired just thinking about it. I have to also paint the deck as soon as we get a warm and dry day again. I also have to finish wood burning the table on the deck and do some finish work on soffits on the veranda. I will also have a little work staining edges of logs and trim boards in the house. Not to mention staining the floor and walls and ceilings upstairs. This I can do in the fall when the weather gets cooler.
It is a daunting task to get it all finished. But I'm going to try.
No comments:
Post a Comment