This is Hubby's birthday and while we really wish we could spend the whole day off in the bush picking berries we really can't afford the time. We have opted to work till 3 p.m. and then head off for a late afternoon of berry picking. Hubby has chosen this as the activity f his dreams for his birthday. Go figure... I like berry picking but that's not my idea of fun let me tell you.
Work on the house has been progressing slowly. I do what I can but I can't lift sheets of plywood and I can't climb ladders too high. I have an unbidden fear of ladders. I tend to stick to trim and paint work and a little framing. Hubby is working on Daughter #2's bedroom today. The goal is to get her into her room before the end of the week and try to get one of the bathroom's finished. I'm not sure this will happen.
Up to date we have the toilet in the downstairs bathroom working and the shower is in place but is not hooked up to any water source or the sewer. The vanity is in and the plumbing is good but the sink was too large and so that has to go back to the store and we'll pick out another. There is a door in the downstairs bathroom and it and one wall has some paneling. Left to be done is hooking up the sink and tub to water and sewer and finish the paneling in there, and then put in the new flooring.
Let's see... the upstairs bathroom has all facilities working but doesn't have any paneling done on three walls and has no door and no flooring (just sub-flooring). It also doesn't have any lights but the electrical boxes are there they just have to have fixtures attached. The closet off the upstairs bathroom is not touched. It needs paneling, electrical, lights, shelves, and door.
Our bedroom has some paneling and the pocket for the door in place. That's it, so we need to install the ceiling and finish paneling and build the closets and that's no small task, then we need to put in our door and the door between the bedroom and the bathroom. We need to cut the door to he balcony and install the window in it, then reinstall the door.
Once all of that is done we need to install the paneling in the studio, install the strapping on the ceiling and install the ceiling tiles. Then we need to panel the stairwell and install the ceiling up over the steps and finish the wall and doors for the laundry closet. Somewhere in there I am hoping to strip the floors in our bedroom and restain and clear coat them. Then back downstairs we need to level the floors and install the new flooring. I have to finish the doors for the pantry and strip and finish the doors for the studio. Outdoors i need to stain the deck (the front one) and stain the facia boards. I also need to install tongue and groove wood on a small portion of wall above the logs under the veranda cover and then stain them. Then we need to cut the office exterior door and install a small door light and it needs a good door knob (the one that is there now sucks)!
In the kitchen we need to install the old shelves and place new counters in there. I think new doors for the old pantry closets are needed.
After all of that is done we need to install all the trim and believe me that will be huge. I'm woodburning and trying to do some as we go but it will be many hours of work yet.
Hmm I think that is it. I wonder if we will be done by Christmas. Forget the fact that we haven't mentioned the stonework on the outside of the house. Scary eh? But what is done looks terrific. We just have to keep going. Eventually it will all be finished and we will be wondering what all the fuss was about. In the meantime have a look...
The newly installed downstairs bathroom door... from the outside looking in..
And from the inside looking out...
The paneling in the downstairs bathroom...
Here's the trim work that I installed in the bathoom..
The recently refixed pantry....
We closed in under the steps so that dust from upstairs wouldn't drift into our food...
This wall needs to be done in the upstairs bathroom as I had to put in the shelf to give us privacy...
We are currently working on our bedroom...
This is the door to the top of the steps with the laundry area which still needs to be enclosed.....
and this is the door way into the upstairs bathroom... my next job is to build the closets there.
The dining area never looked this good....
Neither did the living area.... guess we are getting somewhere with the reno after all...